User Tools

Site Tools


skill-tree:k:4:1:b

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Last revisionBoth sides next revision
skill-tree:k:4:1:b [2020/06/25 20:18] – [Background] kai_hskill-tree:k:4:1:b [2020/07/14 00:40] luciana
Line 1: Line 1:
-# K4.1-B Introduction to job scheduling+# K4.1-B Introduction to Job Scheduling
 # Background # Background
-This skill provides an overview into the scheduling of jobs on a supercomputer.+This skill provides an overview of the scheduling of jobs on a supercomputer.
 It covers generic and widely used concepts that serve the purpose to maximize the efficiency of a supercomputer. It covers generic and widely used concepts that serve the purpose to maximize the efficiency of a supercomputer.
  
Line 16: Line 16:
  
 # Outcomes # Outcomes
-  * comprehend the exclusive and shared usage model in HPC +  * Comprehend the exclusive and shared usage model in HPC 
-  * differentiate batch and interactive job submission +  * Differentiate batch and interactive job submission 
-  * comprehend the generic concepts and architecture of resource manager, scheduler, job and job script +  * Comprehend the generic concepts and architecture of resource manager, scheduler, job and job script 
-  * explain environment variables as a means to communicate +  * Explain environment variables as a means to communicate 
-  * comprehend accounting principles +  * Comprehend accounting principles 
-  * explain the generic steps to run and monitor a single job +  * Explain the generic steps to run and monitor a single job 
-  * comprehend scheduling principles (first come first served, shortest job first, backfilling) to achieve objectives like minimizing the averaged elapsed program runtimes, and maximizing the utilization of the available HPC resources+  * Comprehend scheduling principles (first come first served, shortest job first, backfilling) to achieve objectives like minimizing the averaged elapsed program runtimes, and maximizing the utilization of the available HPC resources
  
 # Subskills # Subskills
  
skill-tree/k/4/1/b.txt · Last modified: 2020/07/19 11:30 by 127.0.0.1