skill-tree:pe:5:b
**This is an old revision of the document!**
Table of Contents
PE5-B Optimization Cycle
Background
The workflow is represented by an optimization cycle with the steps benchmarking, gathering system performance data (e.g. via profiling), analyzing, and tuning.
Aim
Outcomes
- apply the full workflow for tuning a parallel program
Subskills
skill-tree/pe/5/b.1594680669.txt.gz · Last modified: 2020/07/14 00:51 by luciana